The North Pond has basically been finished. The slopes have been seeded and covered with a straw mulch. The wall is done and the pond is up to the normal level.


The South Pond underpass is done. Here you can see the forms around the headwall.

The pumper truck fills in the concrete forms.


The guy on the right in this photo has a chest mounted remote control that moves the pump chute.



Video of the pumper truck in action.

After the forms were removed.

The Arrowood Drain has been started. This will run between #11 tee and #13 tee and returns this to a more historically accurate path for the water.

This is the view from in front of #13 tee.










1 comment:

  1. Its one of the nice content based blog. I want to share a useful information to all of you that is Excavators for sale.Here all kinds of Jcb's are available in new and used condition.Visit that site and get Excavators at very reasonable price.