Thursday, April 18, 2013

Construction Project Update #12


Anderson-Fischer came in this week and laid bluegrass sod behind the four rock walls near 10,12,17 and 18 greens. This will enable those areas to be playable much sooner than if we had seeded the rough there. Unlike the fairway sod that was laid last week, this sod is the normal 18 inches by 36 inches.

The design engineer checks out the sod on #10 and calculates the area.

#12 green is to the left in this picture looking back toward the tee.


#17 green.

A close-up of the seventeenth green.

#18 green, looking back toward the tee.

The view from behind the green.



Tuesday, January 8, 2013

Update #7

After taking some time off at the end of the year, progress has been steady on the Traver Creek project. Unfortunately, snow has fallen and pictures do not come out well in snowy conditions.

Here are some.

On the bridge between #12 green and #13 tee, looking toward #11 green.

Same bridge, looking toward the practice green.

#13 tee.

New crossing over the Arrowood drain, looking toward #11 fairway.

Same crossing, looking back toward #11 tee.

Wetland between #11 green and #12 green after seeding. Taken from the bridge near #12 tee.

Same view,  looking toward #13 tee.


This video was taken from #13 tee. It shows three excavators working on the creek and wetland.









Tuesday, December 18, 2012

Last Update for 2012


The North Pond has basically been finished. The slopes have been seeded and covered with a straw mulch. The wall is done and the pond is up to the normal level.


The South Pond underpass is done. Here you can see the forms around the headwall.

The pumper truck fills in the concrete forms.


The guy on the right in this photo has a chest mounted remote control that moves the pump chute.



Video of the pumper truck in action.

After the forms were removed.

The Arrowood Drain has been started. This will run between #11 tee and #13 tee and returns this to a more historically accurate path for the water.

This is the view from in front of #13 tee.










Monday, December 3, 2012

Construction Update #5

Things have been going pretty well with the Traver Creek Project. The three retaining walls were finished on Friday, November 30th.
Almost done with the north pond (#17) wall.

The wall from the north side.

The wall and rip-rap along the Traver Creek discharge from the pond.

Working on wall 2 by #10 green.

The finished product.

Seeding with native plants along the creek and installing mulch blankets.

Looking down from #17 green toward #10 green.

Starting the final wall near #12 green.

Diversion on the south pond (#12)

The view from 12 tee.

Dredging of the south pond begins.